Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 409 of 409

Styles, for proposals. Locking Margine, Orientation and Font.

No description provided
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Pivot Grid not Intuitive

Pivot Grid not Intuitive
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Bring Back Duration Type Proposals

Bring Back Duration Type Proposals
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Combine the Cost Sources and Cost Source Details templates into one

Instead of having two templates, combine these two into one template.
Aaron Hale over 3 years ago in ProPricer 9 0 Future consideration

The ability to disable the Sync of CER's

This feature enhances the proposal sync process in BOE Pro by allowing users to select which CERs from ProPricer CE to include during synchronization. It improves flexibility and transparency by adding a granular control mechanism and detailed rep...
Aaron Hale 11 months ago in BOE Pro 0 Planned

Multiple signers per workflow step

When there are multiple people assigned to the same Workflow Step, allow the selection of the required signers. Should be able to select all or some of the people on the step.
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Import MS Project with Additional Assignment Mapping

The Assignment Mapping tab when importing from MS Projects file is limited to 1 field. Would like to expand this to 2 or more fields from the Resource Sheet data.
Guest almost 2 years ago in ProPricer 9 0 Future consideration

Access Tags for Material and Resources Fields and their values

Access Tags for Material and Resources Fields and their values
Aaron Hale about 3 years ago in ProPricer 9 0 Planned

Automatic Milestone Payments that keep the contract positive.

The ability to have the system figure out and apply the payments needed to maintain a positive cash flow throughout the proposal.
Aaron Hale about 2 years ago in Cash Flow Pro 0 Future consideration

Option for Continuous Time Period in Pivot Grid/Reports

When there is a break in period of cost data (i.e. first cost in Jan 22 and next cost in Jun 22) then have an option in pivot grids and reports that displays empty periods between periods with cost so that there is still a continuous timescale in ...
Aaron Hale about 3 years ago in ProPricer 9 0 Planned