Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

Ideas

Showing 174 of 437

Import/Export Access Tags

No description provided
almost 4 years ago in ProPricer 9 0 Planned

Option to Suppress periods by task that are out of the POP

Option to Suppress periods by task that are out of the POP
over 2 years ago in Cash Flow Pro 0 Planned

Separate Cash Flow and Cash Flow Cumulative and allow the user to edit the calculation for Cash Flow Cumulative

Separate Cash Flow and Cash Flow Cumulative and allow the user to edit the calculation for Cash Flow Cumulative expression
over 2 years ago in Cash Flow Pro 0 Planned

Add Resource Selection to Summary Travel Report

This will allow us to use a resource selection on this report.
over 2 years ago in ProPricer 9 0 Planned

Add Auto Filter Row to Resource Field Library

This will be very helpful for our long list of departments in our resource fields.
over 2 years ago in ProPricer 9 0 Planned

Multi-Currency Support for Cash-Flow Sheets

The ability to report the cash flow in any currency.
almost 3 years ago in Cash Flow Pro 0 Planned

Change Annual Timescale Period Range when using (Using Ctrl+T+A) in Resource Input

Please add the ability to change the timescale to a specific fiscal period when estimating hours/costs on a monthly basis. It would be very useful to be able to use the annualized timescale toggle to estimate based upon a specified fiscal period (...
almost 3 years ago in ProPricer 9 0 Future consideration

Giving Limited Folder Access Rights to User Roles

Please add the ability to give specific user roles the ability to move proposals between specific folders without giving them the ability to Add or Modify existing folders. Essentially, we would like to give our Estimator Roles the ability to move...
almost 3 years ago in ProPricer 9 0 Future consideration

Lock Down Timescale on Properties-General Menu

Please add the ability for a system setting to lock down the timescale dropdown menu from being changed by users. We price on a monthly basis and users should never switch the timescale at the proposal level. Once this field is changed, there isn'...
almost 3 years ago in ProPricer 9 0 Future consideration

Material Selection for Proposal-Specific Parts

Please add the ability to create a material selection on proposal-specific parts that are not in the parts library. Currently, the Material Selection is limited to the common parts library list only. However, we mostly price proposal-specific part...
almost 3 years ago in ProPricer 9 0 Future consideration