Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 379 of 379

Jump to BOE VIEW or Estimates View from Estimates List

Description: On the Estimates List provide an option to open the estimate in BOE View of the Estimates View Use Case/Example: A BOE user may be reviewing the estimates on the Estimates List and find an item that needs to be adjusted. The user need...
Guest 7 months ago in BOE Pro 0 Planned

Jump to filtered Estimate List from BOE List.

Description: Clicking on the any unassigned item in the Total Hours/Unites/Cost Summary Widget should Open the Estimates List filtered for estimate not assigned. Use Case/Example: As a BOE author, reviewer, or approver I need a quick way to see al...
Guest 7 months ago in BOE Pro 0 Planned

BOE Check List, Workflow and BOE Section

Description: This BOE Pro feature adds a required customizable checklist as a BOE Section to track key proposal steps. The checklist must be fully completed before advancing, ensuring no critical tasks are missed. The enhanced BOE Section streamli...
Guest 7 months ago in BOE Pro 0 Planned

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Sanitize proposal prior to sending to EBS

Create menu of options to delete/scramble names, bidders, BOE, etc etc etc. Often times a request for a .zip by EBS is for only one issue, and a lot of the data can be stripped out.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Curve Unit Price to Proposal Quantity

Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Enhance "Formula" Module Functionality

Currently, the "Formula" tab allows only numeric calculations (for ex.: 10,000 Factory hours * 0.25 Factory Support Metric = 2,500 Factory Support hours). Could "Formula" be enhanced to allow calculations referring to the contents of other Task ID...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Footer On All Worksheets When Exporting Full Pricing

When printing a report to Excel with Full Pricing, the designated report footer does not print on the Rate worksheets. Would like to see the assigned report footer should print on all worksheets.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Smart Tracking Number

Description: The ability to include the offeror, solicitor, and date created in the proposal tracking number. Use Case/Example: When keeping track of a proposal and all its iterations in Multiple tools, the user needs to be able to configure the u...
Guest 7 months ago in Management Pro 0 Future consideration