Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

ProPricer 9

Showing 134

Pivot Table Fields - Add % of Cost Elements Options

Pivot Table Fields - Add % of Cost Elements Options, for example % Gross Profit and % NET Profit.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Enhance "Formula" Module Functionality

Currently, the "Formula" tab allows only numeric calculations (for ex.: 10,000 Factory hours * 0.25 Factory Support Metric = 2,500 Factory Support hours). Could "Formula" be enhanced to allow calculations referring to the contents of other Task ID...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Footer On All Worksheets When Exporting Full Pricing

When printing a report to Excel with Full Pricing, the designated report footer does not print on the Rate worksheets. Would like to see the assigned report footer should print on all worksheets.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Planned

Make Override for Material Escalation

Please add the ability to convert all material escalation on a proposal to an override so they will not be updated when the Escalation Table is updated. Or, make the ability to stop the escalation rates from updating when the Escalation Table is u...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Grand Total only on Pivot Grid

| The selection to untick the Totals in propricer pivot was a great addition - is it possible to allow for disabling each subtotal but retain the grand total for the proposal? |
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Default Auto-filter Row to Always On

The Autofilter Row is an EXTREMELY useful part of ProPricer that we use all the time. However, it seems to randomly hide itself without much reason. The suggestion is to either make the AutoFilter always show all the time, allow a user to set this...
Aaron Hale over 2 years ago in ProPricer 9 0 Planned

Disabling Material Time-Phased Base Unit Cost Grid

Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins 4 months ago in ProPricer 9 0 Future consideration

Moving Child Groups

Currently, if a child group needs to be moved under a different Parent group, the entire row must be deleted and it has to be rebuilt again under the new Parent group. It would be helpful if all of the existing fields did not have to be deleted. A...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration