Introducing more flexible Direct Rate Table functionality:
Multiple Direct Rate Tables per Proposal: A proposal can now have multiple direct rate tables attached, allowing different escalation timescales (e.g., Month, Quarter, Year) in separate ...
Direct Rate Override Copy Function includes rates and escalation sets
Description: We had a proposal that used our standard labor category setup that the client requested we modify in a subsequent revision to include key staff (individual names) designations and project role category descriptions. The base rates and...
Print BOE Text at Multiple levels on Bid Cost Worksheet
Enhance the system to allow users to print the Basis of Estimate (BOE) text organized by Work Breakdown Structure (WBS) at both the Task and Product Breakdown Structure (PBS) levels simultaneously. This functionality should enable comprehensive re...
Under the Risk Assessments input table that feeds into the DD 1547 form there is a misalignment of unit of measurements. DFARs requirements is in months while Propricer is in Years. The DFARs that drives the requirements for the DD 1547 form, unde...
The concurrent license validation is required every 6 months. Could an enhancement be made to provide some sort of alert when the validation will be required within the next N days? This will allow for me to plan downtime with the users to validat...
Please add the ability to see a list of all resources missing from a rate table when switching direct rate tables from an older one to a new one. Currently, when you switch the direct rate table and the resources used on the proposal are no longer...
Option for Continuous Time Period in Pivot Grid/Reports
When there is a break in period of cost data (i.e. first cost in Jan 22 and next cost in Jun 22) then have an option in pivot grids and reports that displays empty periods between periods with cost so that there is still a continuous timescale in ...