Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 386

Inherit Access Tags from Location

Description: Allow the assigning of Access Tags to locations. When a Cost Volume is saved in an area, it should inherit all the access tags from the location. If the Cost Volume is moved to a different location, the inherited access tags are updat...
Aaron Hale 10 months ago in Cost Volume Pro 0 Future consideration

Document Comments and for Review

Description: Add the ability to leave a comment on the document like MS Word. Comments should be review-able comment-able and completable and integrate into the activity feed for the section. Use Case/Example: Document review requires a iterative ...
Aaron Hale 11 months ago in Cost Volume Pro 0 Planned

Reference External Document links

Description: Provide the ability to reference linked documents like SharePoint or other tools with linked access-controlled file delivery capabilities. Links should be specific to files being delivered with that cost volume submittal. Use Case/Exa...
Aaron Hale 11 months ago in Cost Volume Pro 0 Planned

Import MS Project with Additional Assignment Mapping

The Assignment Mapping tab when importing from MS Projects file is limited to 1 field. Would like to expand this to 2 or more fields from the Resource Sheet data.
Guest over 1 year ago in ProPricer 9 0 Future consideration

Changes in the Header and Footer of the structure apply to child section.

Changes made to the Header and Footer of the structure will automatically apply to all child sections within that structure. This ensures consistency across the document by propagating updates from the parent section to its associated child sectio...
Aaron Hale 11 months ago in Cost Volume Pro 0 Future consideration

Notifications on Proposal Submit

Description: The ability to notify the proposal managers and CCed by email when a proposal is submitted. Use Case/Example: Pricing does not always know when the proposal was submitted. Notify the right people when a proposal is submitted.
Aaron Hale 11 months ago in BOE Pro 0 Future consideration

Automatic Milestone Payments that keep the contract positive.

The ability to have the system figure out and apply the payments needed to maintain a positive cash flow throughout the proposal.
Aaron Hale almost 2 years ago in Cash Flow Pro 0 Future consideration

Access Tags for Material and Resources Fields and their values

Access Tags for Material and Resources Fields and their values
Aaron Hale almost 3 years ago in ProPricer 9 0 Planned

Option for Continuous Time Period in Pivot Grid/Reports

When there is a break in period of cost data (i.e. first cost in Jan 22 and next cost in Jun 22) then have an option in pivot grids and reports that displays empty periods between periods with cost so that there is still a continuous timescale in ...
Aaron Hale almost 3 years ago in ProPricer 9 0 Planned

Rate Modifiers Available in BOE Pro

If the proposal in CE uses rate modifiers, make these items available for the estimator in BOE Pro to select.
Aaron Hale almost 2 years ago in BOE Pro 0 Planned