Skip to Main Content
ProPricer Ideas Portal
Status Planned
Workspace Cost Volume Pro
Created by Guest
Created on Apr 16, 2026

Ability to Stop/Cancel processing of Cost Volume before completion

Feature Request: Ability to stop or cancel Cost Volume processing

Summary:
Provide users with a way to stop or cancel an in-progress Cost Volume processing job so they can quickly correct inputs or configuration without waiting for the job to complete. The system should safely terminate processing and return the Cost Volume to an editable state while maintaining data integrity.

Problem Statement:
Today, once Cost Volume processing starts, users must wait for the job to run to completion before they can make any changes. If they notice an error mid-processing (for example, incorrect parameters, source data, or configuration), there is no way to interrupt the job. This leads to wasted processing time, delayed corrections, and user frustration, especially for long-running Cost Volume jobs.

Proposed Solution:
Introduce a controlled cancellation capability for Cost Volume processing jobs:
- Provide a visible "Stop" or "Cancel" action for active Cost Volume jobs.
- When triggered, safely terminate the processing job and roll back any partial changes that could leave the Cost Volume in an inconsistent state.
- Return the Cost Volume to an editable status so users can immediately adjust inputs and restart processing as needed.
- Ensure that, while one Cost Volume is processing (or being cancelled), users can continue to edit other Cost Volumes in the system without interruption.
- Optionally provide status messaging/logs indicating that processing was cancelled, by whom, and at what time.

Benefits:
- Reduces wasted time waiting for incorrect or obsolete Cost Volume runs to complete.
- Enables faster correction of input errors and configuration issues.
- Improves overall system usability and user satisfaction for long-running Cost Volume processes.
- Minimizes risk of data inconsistency by handling cancellation in a controlled, system-managed way.
- Allows users to remain productive by continuing to work on other Cost Volumes while processing or cancellation is in progress.

  • Attach files