Export BOEs to Appropriate Open Plan Note Categories
Summary: Allow BOEs to export to matching Open Plan note categories. Problem Statement: Updated BOEs are written back only to the default Open Plan note field, limiting documentation fidelity. Proposed Solution: Enable BOEs to export to the approp...
Ability to add Supplier (Material) NRE cost as a field in the Cost Source
Adding Supplier (Material) NRE cost as "Associated Cost" is not efficient. You should be able to add it in the Cost Source. There should also be a field that shows the Extended Cost (Unit Price x Proposed Quantity + NRE cost). Price/Cost Analysis ...
Enhance the ProPricer Server Config Tool to allow client-side logging configuration through the recently added OpenTelemetry protocol integration, enabling customers to easily set up centralized logging for user clients. Currently, the tool only s...
Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
Create menu of options to delete/scramble names, bidders, BOE, etc etc etc. Often times a request for a .zip by EBS is for only one issue, and a lot of the data can be stripped out.
Focused on improving resource selection for Services-type proposals:
Rate Source Selection Field: Add a field to capture the rate source when selecting a resource.
Rate Attributes Field: Add fields to capture rate attributes for better resourc...
A new optional feature designed to handle advanced rate management for Service-Type proposals that require it:
Choice at Proposal Creation: Users can select Rate Builder instead of Rate Card when setting up a proposal.
Comprehensive Rate Mana...
Introducing more flexible Direct Rate Table functionality:
Multiple Direct Rate Tables per Proposal: A proposal can now have multiple direct rate tables attached, allowing different escalation timescales (e.g., Month, Quarter, Year) in separate ...
Update Resource Field Values After Changes are Made in the Resource Library Table
After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...