Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 404 of 404

Disabling Material Time-Phased Base Unit Cost Grid

Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins 10 months ago in ProPricer 9 0 Future consideration

The ability to drag a task to another PBS

The ability to drag a task to another PBS. The task cannot be moved if it is connected to a BOE at the PBS Level.
Aaron Hale over 2 years ago in BOE Pro 0 Planned

Enable Filtering by default

Enable the default filter row on all grides, and remember user settings.
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Customer View of BOE in POE Pro

Customer View of BOE in POE Pro
Aaron Hale over 1 year ago in BOE Pro 0 Future consideration

Set Different Levels for SOW and BOE in the proposal properties.

The options are confusing, specifically the option Task means for SOW on both and BOE-only Task. I think it will be better if we have separate options for Link SOW and Link BOE.
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Styles, for proposals. Locking Margine, Orientation and Font.

No description provided
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Pivot Grid not Intuitive

Pivot Grid not Intuitive
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Bring Back Duration Type Proposals

Bring Back Duration Type Proposals
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Combine the Cost Sources and Cost Source Details templates into one

Instead of having two templates, combine these two into one template.
Aaron Hale over 3 years ago in ProPricer 9 0 Future consideration

The ability to disable the Sync of CER's

This feature enhances the proposal sync process in BOE Pro by allowing users to select which CERs from ProPricer CE to include during synchronization. It improves flexibility and transparency by adding a granular control mechanism and detailed rep...
Aaron Hale 11 months ago in BOE Pro 0 Planned