Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 220

Update Template for CER Base/Derivative Changes

Just like the Update Current Proposal offers the ability to update the CERs, it would be nice if there was the same option on the templates.
Guest over 1 year ago in ProPricer 9 0 Future consideration

Long Running Process Visible After closing Browser

Long Running Process Visible After closing Browser
Aaron Hale over 1 year ago in BOE Pro 0 Future consideration

The ability to define header and footer information in the structure section

The ability to define header and footer information in the structure section. The header and footer set at the Structure Section apply to all child elements.
Aaron Hale 11 months ago in Cost Volume Pro 0 Future consideration

Batch Report Options

Allow batch reports to be saved that do not have default start/end dates for the Period Selection in rate reports (specifically the Rate Band and Indirect Rate reports.) Currently we have a manual work around where we export the batch report out o...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Disabling Material Time-Phased Base Unit Cost Grid

Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins 6 months ago in ProPricer 9 0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration