Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 211

Import MS Project with Additional Assignment Mapping

The Assignment Mapping tab when importing from MS Projects file is limited to 1 field. Would like to expand this to 2 or more fields from the Resource Sheet data.
Guest over 1 year ago in ProPricer 9 0 Future consideration

Add Paste Special Functionality

Excel Paste Special Functionality within the Import Export tool.
Guest about 2 years ago in ProPricer 9 0 Future consideration

Automatic Milestone Payments that keep the contract positive.

The ability to have the system figure out and apply the payments needed to maintain a positive cash flow throughout the proposal.
Aaron Hale over 1 year ago in Cash Flow Pro 0 Future consideration

Export Only the Rates used in the Proposal

Add the option to I/E to export only the rates (all rate tables) used within the proposal.
Aaron Hale over 2 years ago in ProPricer 9 0 Future consideration

Add a "Multiple Documents" checkbox to the Report Options when printing to Word

Checking the "Multiple Documents" checkbox would work in a similar way to checking the "Multiple Worksheets" checkbox when printing a report to Excel. However, instead of each report being created in a separate tab in Excel, each report would be c...
Guest 10 months ago in ProPricer 9 0 Future consideration

Styles Lock and Styles Replace

The ability to Lock the styles and find and replace any style in the document.
Aaron Hale over 1 year ago in Cost Volume Pro 0 Future consideration

Add Wildcard Use for Formula Expressions

No description provided
Aaron Hale over 2 years ago in ProPricer 9 0 Future consideration

Be able to place a limit on the number of characters allowed on a BOE Sections

Be able to place a limit on the number of characters allowed on a BOE Sections.
Aaron Hale almost 2 years ago in BOE Pro 0 Future consideration

Add variables to Expressions in Calculations. Variables can point to single a BOE Total Direct Cost (or Total Price) or several.

Add variables to Expressions in Calculations. Variables can point to single a BOE Total Direct Cost (or Total Price) or several.
Aaron Hale almost 2 years ago in BOE Pro 0 Future consideration

MS Project

Import the PBS and Tasks from MS Project
Aaron Hale almost 2 years ago in BOE Pro 0 Future consideration