Direct Rate Table Enhancements

Introducing more flexible Direct Rate Table functionality: Multiple Direct Rate Tables per Proposal: A proposal can now have multiple direct rate tables attached, allowing different escalation timescales (e.g., Month, Quarter, Year) in separate ...
Estevan Mercado 3 months ago in ProPricer 9 0 Planned

Direct Rate Override Copy Function includes rates and escalation sets

Description: We had a proposal that used our standard labor category setup that the client requested we modify in a subsequent revision to include key staff (individual names) designations and project role category descriptions. The base rates and...
Cory Miller 3 months ago in ProPricer 9 0 Planned

Group Pivot Grid Data

It would make it very convenient to be able to group multiple data selections under one renamed header. For example, if the algorithm contains several direct cost elements, it would be nice to add those in a pivot grid, then merge them into one re...
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Future consideration

Curve Unit Price to Proposal Quantity

Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Planned

Add the ability to archive and/or delete Audit and Change Log Files

Currently, ProPricer can be configured to produce "Change" and "Audit" logs, which is great! Since this information is stored in the database, some method of archiving and/or deleting log files based on parameters (e.g., date, size, etc.) needs to...
Guest over 1 year ago in ProPricer 9 0 Future consideration

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Future consideration

Sanitize proposal prior to sending to EBS

Create menu of options to delete/scramble names, bidders, BOE, etc etc etc. Often times a request for a .zip by EBS is for only one issue, and a lot of the data can be stripped out.
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Planned

Pivot Table Fields - Add % of Cost Elements Options

Pivot Table Fields - Add % of Cost Elements Options, for example % Gross Profit and % NET Profit.
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Planned

Print BOE Text at Multiple levels on Bid Cost Worksheet

Enhance the system to allow users to print the Basis of Estimate (BOE) text organized by Work Breakdown Structure (WBS) at both the Task and Product Breakdown Structure (PBS) levels simultaneously. This functionality should enable comprehensive re...
Estevan Mercado 4 months ago in ProPricer 9 0 Planned

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
Nikolai Slepushkin over 3 years ago in ProPricer 9 0 Planned