Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

ProPricer 9

Showing 156

Resource Input Grid Enhancements

Focused on improving resource selection for Services-type proposals: Rate Source Selection Field: Add a field to capture the rate source when selecting a resource. Rate Attributes Field: Add fields to capture rate attributes for better resourc...
4 months ago in ProPricer 9 0 Planned

Rate Builder

A new optional feature designed to handle advanced rate management for Service-Type proposals that require it: Choice at Proposal Creation: Users can select Rate Builder instead of Rate Card when setting up a proposal. Comprehensive Rate Mana...
4 months ago in ProPricer 9 0 Planned

Direct Rate Table Enhancements

Introducing more flexible Direct Rate Table functionality: Multiple Direct Rate Tables per Proposal: A proposal can now have multiple direct rate tables attached, allowing different escalation timescales (e.g., Month, Quarter, Year) in separate ...
4 months ago in ProPricer 9 0 Planned

Add the ability to archive and/or delete Audit and Change Log Files

Currently, ProPricer can be configured to produce "Change" and "Audit" logs, which is great! Since this information is stored in the database, some method of archiving and/or deleting log files based on parameters (e.g., date, size, etc.) needs to...
over 1 year ago in ProPricer 9 0 Future consideration

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
over 3 years ago in ProPricer 9 0 Future consideration

Sanitize proposal prior to sending to EBS

Create menu of options to delete/scramble names, bidders, BOE, etc etc etc. Often times a request for a .zip by EBS is for only one issue, and a lot of the data can be stripped out.
over 3 years ago in ProPricer 9 0 Planned

Pivot Table Fields - Add % of Cost Elements Options

Pivot Table Fields - Add % of Cost Elements Options, for example % Gross Profit and % NET Profit.
over 3 years ago in ProPricer 9 0 Planned

Direct Rate Override Copy Function includes rates and escalation sets

Description: We had a proposal that used our standard labor category setup that the client requested we modify in a subsequent revision to include key staff (individual names) designations and project role category descriptions. The base rates and...
4 months ago in ProPricer 9 0 Planned

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
over 3 years ago in ProPricer 9 0 Planned

Make Override for Material Escalation

Please add the ability to convert all material escalation on a proposal to an override so they will not be updated when the Escalation Table is updated. Or, make the ability to stop the escalation rates from updating when the Escalation Table is u...
over 3 years ago in ProPricer 9 1 Future consideration