Enhance "Formula" Functionality

Could "Formula" be enhanced to allow calculations referring to the contents of the Task quantity? For example �1.000,- x Task quantity�.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Disabling Material Time-Phased Base Unit Cost Grid

Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins 5 months ago in ProPricer 9 0 Future consideration

Long Running Process Visible After closing Browser

Long Running Process Visible After closing Browser
Aaron Hale about 1 year ago in BOE Pro 0 Future consideration

Ability to Save and restore Column Selections

I'd like to be able to define a list of columns that I want to see for a given screen (Proposal Inputs, Libraries like Resource Sets, and Materials) and save that selection with a name to choose from a defined list by Admins or User created. Furth...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Flex Shift Materials

Please add the ability for Flex Shift to adjust the dates of the Materials on the Material tab of the Task without changes the rest of the Task.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Disconnect Users from Proposal

Oftentimes, we have to lock a proposal, but users may just leave the proposal open but not be actively using the proposal. As a result, the system will not allow us to lock while "active" users have the proposal open. Please add a button under the...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

The ability to define header and footer information in the structure section

The ability to define header and footer information in the structure section. The header and footer set at the Structure Section apply to all child elements.
Aaron Hale 10 months ago in Cost Volume Pro 0 Future consideration

Batch Report Options

Allow batch reports to be saved that do not have default start/end dates for the Period Selection in rate reports (specifically the Rate Band and Indirect Rate reports.) Currently we have a manual work around where we export the batch report out o...
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration