Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

ProPricer 9

Showing 150 of 418

Proposal CER Derivative Assignments

Description: Add functionality to proposal CERs to allow for CER derivatives to be applied or assigned to different areas on the proposal via Task Selection. Use Case/Example: I set up a multi-derivative CER, but I want each derivative value to be...
8 months ago in ProPricer 9 0 Future consideration

Upload multiple Summary Fields and Resources Fields w/ I.E. tool at one time

Description: Upload multiple Summary Fields and Resources Fields w/ I.E. tool at one time Use Case/Example: It would be really great if we had the ability to upload multiple Summary/Resource Field Value Lists at the same time. Currently, when uplo...
8 months ago in ProPricer 9 0 Future consideration

Resource Input Grid Enhancements

Focused on improving resource selection for Services-type proposals: Rate Source Selection Field: Add a field to capture the rate source when selecting a resource. Rate Attributes Field: Add fields to capture rate attributes for better resourc...
3 months ago in ProPricer 9 0 Planned

Rate Builder

A new optional feature designed to handle advanced rate management for Service-Type proposals that require it: Choice at Proposal Creation: Users can select Rate Builder instead of Rate Card when setting up a proposal. Comprehensive Rate Mana...
3 months ago in ProPricer 9 0 Planned

Direct Rate Table Enhancements

Introducing more flexible Direct Rate Table functionality: Multiple Direct Rate Tables per Proposal: A proposal can now have multiple direct rate tables attached, allowing different escalation timescales (e.g., Month, Quarter, Year) in separate ...
3 months ago in ProPricer 9 0 Planned

Direct Rate Override Copy Function includes rates and escalation sets

Description: We had a proposal that used our standard labor category setup that the client requested we modify in a subsequent revision to include key staff (individual names) designations and project role category descriptions. The base rates and...
4 months ago in ProPricer 9 0 Planned

Group Pivot Grid Data

It would make it very convenient to be able to group multiple data selections under one renamed header. For example, if the algorithm contains several direct cost elements, it would be nice to add those in a pivot grid, then merge them into one re...
over 3 years ago in ProPricer 9 0 Future consideration

Curve Unit Price to Proposal Quantity

Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
over 3 years ago in ProPricer 9 0 Planned

Add the ability to archive and/or delete Audit and Change Log Files

Currently, ProPricer can be configured to produce "Change" and "Audit" logs, which is great! Since this information is stored in the database, some method of archiving and/or deleting log files based on parameters (e.g., date, size, etc.) needs to...
over 1 year ago in ProPricer 9 0 Future consideration

CER Bases and Factor on DCB

Please allow the CER Bases (derivatives) and Rate/Factors to display on the Detail Cost Breakdown. Currently, only the total CER cost is displayed without showing the base and factor/rate.
over 3 years ago in ProPricer 9 0 Future consideration