Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

Ideas

Showing 215 of 437

Link ProPricer to ERI

Would it be possible to partner with ERI (Economic Research Institute) for wage information? ERI is a paid subscription so we understand this may entail an additional cost. Linking to the ERI database would allow users to select wage rates for exe...
over 1 year ago in ProPricer 9 0 Future consideration

Lockable Product Libraries

Description: Add permissions to lock a product library. Allowing a library to remain in materials but unable to change costing and bom data Use Case/Example: When associated costs or BOM structure changes for a product the previously quoted bom sh...
11 months ago in ProPricer 9 0 Future consideration

Modifiable Field(s) in Proposal List Screen

Please allow edits to Proposal User Fields directly within the Proposal List Screen. Currently, when double-clicking "proposal" in the navigation pane, it pulls up a full list of proposals. Within that field are many of the proposal properties men...
11 months ago in ProPricer 9 0 Future consideration

AI Smart Mapping

Have AI read the document and add the tags for the right data from ProPricer.
almost 2 years ago in Cost Volume Pro 0 Planned

Define and name multilevel subfolders

Define and name multilevel subfolders, Subfolders should include the structure section as a top-level folders by default and have the ability to create and name the folder structure
almost 2 years ago in Cost Volume Pro 0 Planned

Add Summary Fields to Summary Travel ad-hoc report

Currently, there is no ability to add the summary fields as an ad-hoc layout option for the Summary Travel report. Please add this as an option.
almost 2 years ago in ProPricer 9 0 Future consideration

Refresh Labor Resources and Fields

Add the ability to refresh the resource fields based upon the current rate tables. For example, if staff switch report categories between revisions and the data is copied from a previous proposal, the report category remains as it was originally a...
over 3 years ago in ProPricer 9 0 Future consideration

Please add the Resource Class to the Excel Export

Please add the Resource Class to the Excel Export
over 3 years ago in ProPricer 9 0 Future consideration

Add a Default Learning Curve to Materials

Allow me to define a default Learning Curve and then I can change in the instances I need.
over 3 years ago in ProPricer 9 0 Future consideration

Copy Material Row in Material View

Please add the ability to easily copy a row within the Material View, as the functionality exists for Resources or Travel within their respective Views. We generally use proposal-specific parts as most of our purchases aren't repeatable purchases....
over 3 years ago in ProPricer 9 0 Future consideration