The ability to define header and footer information in the structure section
The ability to define header and footer information in the structure section. The header and footer set at the Structure Section apply to all child elements.
Aaron Hale
10 months ago
in Cost Volume Pro
0
Future consideration
Disabling Material Time-Phased Base Unit Cost Grid
Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins
5 months ago
in ProPricer 9
0
Future consideration
Allow batch reports to be saved that do not have default start/end dates for the Period Selection in rate reports (specifically the Rate Band and Indirect Rate reports.) Currently we have a manual work around where we export the batch report out o...
Nikolai Slepushkin
almost 3 years ago
in ProPricer 9
0
Future consideration
Automatically hide BOE List Values that do not have Text Section mapped to them
Implement the capability to automatically hide BOE list values that lack corresponding text section mappings. This automation should streamline user workflows by eliminating the need to manually check and hide irrelevant sections, thereby reducing...
Include the ability to add multiple scheduled rates to a single resource.
I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin
almost 3 years ago
in ProPricer 9
0
Future consideration
Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin
almost 3 years ago
in ProPricer 9
0
Future consideration
Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin
almost 3 years ago
in ProPricer 9
0
Future consideration