Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 381 of 381

Risk Assessment Timescale update

Under the Risk Assessments input table that feeds into the DD 1547 form there is a misalignment of unit of measurements. DFARs requirements is in months while Propricer is in Years. The DFARs that drives the requirements for the DD 1547 form, unde...
Guest over 1 year ago in ProPricer 9 0 Planned

The ability to see FTEs on the pivot gride.

The ability to see FTEs on the pivot gride.
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Pivot Grid not Intuitive

Pivot Grid not Intuitive
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Bring Back Duration Type Proposals

Bring Back Duration Type Proposals
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Inherit Access Tags from Location

Description: Allow the assigning of Access Tags to locations. When a Cost Volume is saved in an area, it should inherit all the access tags from the location. If the Cost Volume is moved to a different location, the inherited access tags are updat...
Aaron Hale 9 months ago in Cost Volume Pro 0 Future consideration

The ability to drag a task to another PBS

The ability to drag a task to another PBS. The task cannot be moved if it is connected to a BOE at the PBS Level.
Aaron Hale about 2 years ago in BOE Pro 0 Planned

Document Comments and for Review

Description: Add the ability to leave a comment on the document like MS Word. Comments should be review-able comment-able and completable and integrate into the activity feed for the section. Use Case/Example: Document review requires a iterative ...
Aaron Hale 9 months ago in Cost Volume Pro 0 Planned

Reference External Document links

Description: Provide the ability to reference linked documents like SharePoint or other tools with linked access-controlled file delivery capabilities. Links should be specific to files being delivered with that cost volume submittal. Use Case/Exa...
Aaron Hale 9 months ago in Cost Volume Pro 0 Planned

Adding the Match Capability to Profit/Fee in the CER Derivatives

The issue with assigning the Profit/Fee rate at the resource level is that there is no way for the CER derivatives to inherit the Profit/Fee rate assigned to the base resource that generated it.
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Refresh Labor Resources and Fields

Add the ability to refresh the resource fields based upon the current rate tables. For example, if staff switch report categories between revisions and the data is copied from a previous proposal, the report category remains as it was originally a...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration