Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 415 of 415

Styles, for proposals. Locking Margine, Orientation and Font.

No description provided
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Pivot Grid not Intuitive

Pivot Grid not Intuitive
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Bring Back Duration Type Proposals

Bring Back Duration Type Proposals
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Disabling Material Time-Phased Base Unit Cost Grid

Hello, Please add the ability to disable the Timephase Base Unit Cost Grid in ProPricer when estimating materials. This grid can create difficulties when reviewing the material list if this grid is populated with hundreds of material line items. R...
Jake Jenkins 12 months ago in ProPricer 9 0 Future consideration

Event Triggers for DBIT.

The ability to trigger DBIT based on events within ProPricer
Aaron Hale about 3 years ago in Integration Pro 0 Future consideration

Multiple signers per workflow step

When there are multiple people assigned to the same Workflow Step, allow the selection of the required signers. Should be able to select all or some of the people on the step.
Aaron Hale about 2 years ago in BOE Pro 0 Planned

The ability to disable the Sync of CER's

This feature enhances the proposal sync process in BOE Pro by allowing users to select which CERs from ProPricer CE to include during synchronization. It improves flexibility and transparency by adding a granular control mechanism and detailed rep...
Aaron Hale about 1 year ago in BOE Pro 0 Planned

Import MS Project with Additional Assignment Mapping

The Assignment Mapping tab when importing from MS Projects file is limited to 1 field. Would like to expand this to 2 or more fields from the Resource Sheet data.
Guest about 2 years ago in ProPricer 9 0 Future consideration

Access Tags for Material and Resources Fields and their values

Access Tags for Material and Resources Fields and their values
Aaron Hale about 3 years ago in ProPricer 9 0 Planned

Option for Continuous Time Period in Pivot Grid/Reports

When there is a break in period of cost data (i.e. first cost in Jan 22 and next cost in Jun 22) then have an option in pivot grids and reports that displays empty periods between periods with cost so that there is still a continuous timescale in ...
Aaron Hale about 3 years ago in ProPricer 9 0 Planned