Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

Ideas

Showing 142

Proposal-Specific Overrides for Multiple Indirect Pools

Please create the ability to update multiple indirect pools at one time for proposal-specific overrides. The functionality exists for global indirect pool updates, but often times, clients will have caps on specific indirect rates. As a result, we...
over 3 years ago in ProPricer 9 0 Future consideration

Flex Shift Materials

Please add the ability for Flex Shift to adjust the dates of the Materials on the Material tab of the Task without changes the rest of the Task.
over 3 years ago in ProPricer 9 0 Future consideration

Disconnect Users from Proposal

Oftentimes, we have to lock a proposal, but users may just leave the proposal open but not be actively using the proposal. As a result, the system will not allow us to lock while "active" users have the proposal open. Please add a button under the...
over 3 years ago in ProPricer 9 0 Future consideration

Need New Charting Capabilities

Description: Need to be able to create the following charts in Cashflow. Use Case/Example:
7 months ago in Cash Flow Pro 0 Future consideration

Bulk Edit Table Properties

Feature Request: Bulk Update Table Properties Description: Enable users to perform bulk updates to table properties within the editor. This feature would allow users to efficiently modify attributes such as cell borders, cell background color, and...
7 months ago in Cost Volume Pro 0 Future consideration

Update Template for CER Base/Derivative Changes

Just like the Update Current Proposal offers the ability to update the CERs, it would be nice if there was the same option on the templates.
over 2 years ago in ProPricer 9 0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
over 3 years ago in ProPricer 9 0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
over 3 years ago in ProPricer 9 0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
over 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
over 3 years ago in ProPricer 9 0 Future consideration