Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

ProPricer 9

Showing 135

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Use Resource Spread Dates when using the Flex/Shift What-if feature for an Individual Resource

When Flex/Shifting an individual resource in a Task, the dates displayed in the dialog are the Start and End dates of the Task, not the dates of the spread of the specific resource. If the resource is not spread across the entire Task period of pe...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Risk Assessment Timescale update

Under the Risk Assessments input table that feeds into the DD 1547 form there is a misalignment of unit of measurements. DFARs requirements is in months while Propricer is in Years. The DFARs that drives the requirements for the DD 1547 form, unde...
Mikala Stephenson over 1 year ago in ProPricer 9 0 Planned

Adding the Match Capability to Profit/Fee in the CER Derivatives

The issue with assigning the Profit/Fee rate at the resource level is that there is no way for the CER derivatives to inherit the Profit/Fee rate assigned to the base resource that generated it.
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Hierarchy Structure on Import/Export from Excel, and selecting reports

Some parts of ProPricer are flat. For instance, when I need to pick a proposal for a report, it's a flat alphabetical list. It would be easier if I could see the proposal tree with all my folders. Same with import/export from Excel. Believe there ...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Ability to quiesce the server service

Please add the ability to quiesce the server to permit a graceful/controlled restart of the server process. Allow existing connections remain (so they can be gracefully closed by the users or administrators). But don't allow new connections to be ...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration