Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 385

Add more to the selection widgets (all the summary info) and cost types

Description: The selected info widget is lacking information about price and resource types.
Guest 3 months ago in BOE Pro 0 Future consideration

Button to Export to Excel from the ESI Preview.

Description: Not all estimators will know how to right-click to export results to Excel. Use Case/Example: Add a button at the bottom for export to Excel to make it easier to find estimators.
Kenny Louden 3 months ago in BOE Pro 0 Future consideration

Ability to add Supplier (Material) NRE cost as a field in the Cost Source

Adding Supplier (Material) NRE cost as "Associated Cost" is not efficient. You should be able to add it in the Cost Source. There should also be a field that shows the Extended Cost (Unit Price x Proposed Quantity + NRE cost). Price/Cost Analysis ...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 2 Planned

Add the ability to pre-pull actuals

Description: The proposal owner needs the ability to pre-pull the entire list of articles from a project and store them locally to the proposal in BOE Pro. Then when the estimator queries for data, they only receive results from those preloaded va...
Guest 4 months ago in BOE Pro 0 Future consideration

Proposal Level Permission Overrides

Proposal Level Permission Overrides like CE. Implement Proposal-Level Permission Overrides in BOE Pro similar to those in Contractor Edition (CE). This feature will allow users to set specific permissions at the proposal level, enhancing control ...
Guest 9 months ago in BOE Pro 0 Planned

Option to Ignore Margines on added documents

Description: Use Case/Example:
Guest 4 months ago in BOE Pro 0 Future consideration

Edit travel rate by travel element

Description: The ability to limit and edit the travel rate by the travel element. Use Case/Example: The user needs to edit the airfare travel rate, but they should not be able to edit the peridium rate.
Guest 4 months ago in BOE Pro 0 Future consideration

More Columns for the Cost Volumes Screen

Description: Add more columns for the Cost Volume Screen. At least, Created by, Created Date, and Last modified,
Kenny Louden 4 months ago in Cost Volume Pro 0 Future consideration

Three Point Estimating feature in BOE Pro

Description: Add a feature to allow 3 point estimating in BOE Pro. Use Case/Example: Feature exists in CE but having it available in BOE Pro would allow a larger estimator userbase to have access to it while writing BOEs
Guest 2 months ago in BOE Pro 0 Future consideration

Feature Request: Add Remaining to the Audit Report and Warn on Submit to CE

Summary: Users want to ensure that all values in a BOE are fully allocated before submitting to CE. To support this, we should add a "Remaining" column to the Audit report that shows unallocated values, and trigger a warning during the Submit to C...
Guest 4 months ago in BOE Pro 0 Future consideration