Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 216

Update Template for CER Base/Derivative Changes

Just like the Update Current Proposal offers the ability to update the CERs, it would be nice if there was the same option on the templates.
Guest almost 2 years ago in ProPricer 9 0 Future consideration

Mail in the Project

Description: Need the ability to have all emails related to a project saved to the project and the ability to email from a project. Use Case/Example: Most communication about a project happens via Outlook. The problem is that the documentation exi...
Aaron Hale 6 months ago in Management Pro 0 Future consideration

Long Running Process Visible After closing Browser

Long Running Process Visible After closing Browser
Aaron Hale over 1 year ago in BOE Pro 0 Future consideration

Preview button on commands doing changes on proposal

Description: Since we do not support Undo command, I think we should think which commands can benefit the most from having a Preview button like Bulk Import and Create From BOE Library. The idea is to let the user know what the result of the execu...
Guest about 1 year ago in BOE Pro 0 Future consideration

Create from BOE Library process improvements

Description: Currently the process is matching library data by name, but it would be better if the user is provided with a window similar to Audit page where he would be able to select by himself the matching. If a there is a matching item by name...
Guest about 1 year ago in BOE Pro 0 Future consideration

Remove the Calculation when the Formula is removed.

Description: When a user manual removes a formula from the BOE section, delete it from the Calculation Tab. If the calculation already has Resources assigned, provide a popup asking the user if they want to delete the resource assignment. When the...
Aaron Hale 6 months ago in BOE Pro 0 Future consideration

Include the ability to add multiple scheduled rates to a single resource.

I would like to be able to add multiple scheduled rates to a single resource. In certain cases when a contract may have the choice between contract types, I would like to be able to include the rate deck for all scenarios and run reports to view t...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration