Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Curve Unit Price to Proposal Quantity

Ability to curve the Material Unit price up or down to the Proposed Quantity. For example PO history is for a specific quantity vs Quotes where you may have range pricing. It would be great if the software curved the unit price.
over 4 years ago in ProPricer 9 0 Planned

Footer On All Worksheets When Exporting Full Pricing

When printing a report to Excel with Full Pricing, the designated report footer does not print on the Rate worksheets. Would like to see the assigned report footer should print on all worksheets.
over 4 years ago in ProPricer 9 0 Planned

Sync Custom Resource Names from Contractor Edition Direct Rate Overrides

Feature Request: Sync Custom Resource Names from Contractor Edition Direct Rate Overrides Summary: Ensure that when proposals are synced from Contractor Edition (CE) to BOE Pro, any custom resource names defined in CE direct rate overrides are als...
9 months ago in BOE Pro 0 Future consideration

Retain Report Settings When Archiving Between Instances

Feature Request: Retain Report Settings When Archiving Between Instances Summary: Enable users to archive a cost volume from one instance (e.g., development) and restore it into another instance (e.g., production) while preserving all associated r...
9 months ago in Cost Volume Pro 0 Planned

Authorization Server Activity Feed and Audit API

Feature Request: Authorization Server Activity Feed and Audit API Summary: Provide an activity feed within the authorization server that records key user and access events (logins, logouts, failed logins, user creation, role assignments/changes, a...
9 months ago in Authorization Server 0 Planned

Flexible Access Tag Requirements for Proposal Submission

Feature Request: Flexible Access Tag Requirements for Proposal Submission Summary: Allow users to submit proposals to CE as long as they have at least one of the required access tags assigned to any item within the proposal, rather than requiring ...
9 months ago in BOE Pro 0 Future consideration

Attach New CE Sync Items to BOE Version

Feature Request: Attach New CE Sync Items to BOE Version Summary: Ensure that new resource assignments, estimates, trips, and distributions created via sync from CE are automatically associated with a new version of the BOE, so users can clearly s...
9 months ago in BOE Pro 0 Future consideration

Upload multiple Summary Fields and Resources Fields w/ I.E. tool at one time

Description: Upload multiple Summary Fields and Resources Fields w/ I.E. tool at one time Use Case/Example: It would be really great if we had the ability to upload multiple Summary/Resource Field Value Lists at the same time. Currently, when uplo...
over 1 year ago in ProPricer 9 0 Future consideration

Restrict Copying and Library Saving for Contract-Specific Proposals

Feature Request: Restrict Copying and Library Saving for Contract-Specific Proposals Summary: Add a configurable setting that prevents users from copying tasks and BOEs from certain proposals and from saving those proposals’ BOEs to the shared lib...
9 months ago in BOE Pro 0 Future consideration

Copy/Move a BOE to another Task/PBS

Feature Request: Copy or Move BOE Between Tasks/PBS Elements Summary: Enable users to copy or move a Basis of Estimate (BOE) from one task or PBS element (PBE) to another without recreating it, so that BOEs can be efficiently realigned when the pr...
9 months ago in BOE Pro 0 Future consideration