Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

Ideas

Showing 419 of 437

Time-Phased Estimates in BOE Detail Report

Feature Request: Time-Phased Estimates in BOE Detail Report Summary: Add support for time-phased estimates within the BOE detail report in BOE Pro so that effort and cost can be distributed across time periods (e.g., months, quarters, or fiscal ye...
about 2 years ago in BOE Pro 2 Planned

Proposal Breakdown Structure Bar - reduce white space

Feature Request: Proposal Breakdown Structure Bar – Reduced Indentation White Space Summary: Improve the proposal breakdown structure (PBS) toolbar so that nested folder levels do not create excessive indentation and vertical white space, allowing...
9 months ago in BOE Pro 0 Future consideration

Comment indicators on section cards

Feature Request: Comment Status Indicators on Section Cards Summary: Add visual comment indicators to each section card in the section view so users can quickly see where comments exist and what their current status is, without opening each sectio...
4 months ago in Cost Volume Pro 0 Future consideration

FEE and POP by PBS

Feature Request: FEE and POP Inheritance at PBS Level Summary: Enable users to define FEE overrides and Period of Performance (POP) at the PBS (e.g., CLIN) level so that all underlying tasks automatically inherit the specified FEE% and/or are cons...
over 1 year ago in BOE Pro 3 Planned

Option to include workflow log and reset steps when proposal is copied (log not included default)

Feature Request: Option to include workflow log and reset steps when copying proposals Summary: Enable users to optionally include the workflow log and reset workflow steps when copying a proposal in BOE Pro. By default, the workflow log remains e...
over 1 year ago in BOE Pro 0 Planned

BOE Check List, Workflow and BOE Section

Feature Request: BOE Checklist Section and Workflow Gate Summary: Introduce a required, customizable BOE Checklist as its own BOE Section that must be fully completed before a proposal can advance. This ensures all key proposal steps are tracked, ...
over 1 year ago in BOE Pro 0 Planned

Update Resource Field Values After Changes are Made in the Resource Library Table

After a resource with custom fields & values has been added to a proposal, updates made in the Resource Library to the value(s) for those custom resource fields are not being reflected in the proposal(s) where the resource exists. For example,...
over 3 years ago in ProPricer 9 0 Planned

Make Override for Material Escalation

Please add the ability to convert all material escalation on a proposal to an override so they will not be updated when the Escalation Table is updated. Or, make the ability to stop the escalation rates from updating when the Escalation Table is u...
over 3 years ago in ProPricer 9 1 Future consideration

Enhance "Formula" Module Functionality

Currently, the "Formula" tab allows only numeric calculations (for ex.: 10,000 Factory hours * 0.25 Factory Support Metric = 2,500 Factory Support hours). Could "Formula" be enhanced to allow calculations referring to the contents of other Task ID...
over 3 years ago in ProPricer 9 0 Future consideration

Footer On All Worksheets When Exporting Full Pricing

When printing a report to Excel with Full Pricing, the designated report footer does not print on the Rate worksheets. Would like to see the assigned report footer should print on all worksheets.
over 3 years ago in ProPricer 9 0 Planned