Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 379

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Use Resource Spread Dates when using the Flex/Shift What-if feature for an Individual Resource

When Flex/Shifting an individual resource in a Task, the dates displayed in the dialog are the Start and End dates of the Task, not the dates of the spread of the specific resource. If the resource is not spread across the entire Task period of pe...
Nikolai Slepushkin almost 3 years ago in ProPricer 9 0 Future consideration

Proposal Selection to include Last Modified Date of Today

I would like Propricer to Add a Proposal Selection within Propricer and the IP tool that allows for Any Date to have a selection of Today's date. For instance, if we want a Proprosal Selection to only show only Proposals modified today, we current...
Guest over 1 year ago in Integration Pro 0 Planned

Custom User Fields

The ability to assign custom fields to a user will appear in the Users and Matrix windows for sorting.
Aaron Hale over 1 year ago in Authorization Server 0 Planned

Document Process Options

The ability to process specific parts of the document when clicking the process button.
Aaron Hale 12 months ago in Cost Volume Pro 0 Planned

Recommend the BOE resets back to the start when a new BOE version is created

BOE View: When creating a revision of a BOE, once a BOE has been approved, the new BOE doesn't default to the first step in the workflow process. I recommend the BOE resets to the start when a new BOE version is created. In the screenshot, the 2-(...
Guest 12 months ago in BOE Pro 0 Planned

Date entry like CE

Entering dates in the proposal properties screen (Start Date, End Date, Due Date) requires many clicks especially when changing the month and year. Recommend date entry like CE.
Guest 12 months ago in BOE Pro 0 Planned

BOE Detail report should not generate when there are direct estimates not assigned to a formula.

Reports: BOE Detail report generates when there are direct estimates not assigned to a formula. The estimate not assigned to a calculation is excluded from the BOE. Recommend the BOEs not generating if there is this kind of error.
Guest 12 months ago in BOE Pro 0 Planned