ESI Mutiple Date Fields

Description: The ability to have multiple date fields. The date fields need to be handled like the current date field (summarized the same way) Use Case/Example: I may have several different dates I need to query for.
Guest about 1 month ago in BOE Pro 0 Planned

ESI field criteria

Description: The ability to add a criteria text field to the ESI field properties and have the user see the criteria in the ESI query. Use Case/Example: The user has to use an * to change the search criteria. Example: *1234 means ending in 1234, 1...
Guest about 1 month ago in BOE Pro 0 Planned

BOE Pro ONLY required global resource fields

Description: Need a way to make Global Resource Fields required in BOE Pro but not required in Contractor Edition (CE). Use Case/Example: I have global fields that estimators must fill out. However, some CERs do not use those fields in CE.
Guest about 1 month ago in BOE Pro 0 Planned

Set a default Curve or require the user to select a Curve when entering an estimate.

Description: The ability in CE to set a default Curve is needed in BOE Pro; the default curve can also be blank, requiring the use to select one. Use Case/Example:
Guest 6 months ago in BOE Pro 0 Planned

Add formula total to the total to the BOE text

Description: Include the total in BOE text. Use Case/Example: Right now, the user has to manually add the total number to the BOE text, and if the calculation is updated, the total is not also updated. The calculation needs to automatically includ...
Guest 6 months ago in BOE Pro 0 Planned

Auto Numbering for PBS and Task.

Description: Need the ability to auto number for a specific PBS level and have the Tasks under that PBS level auto number. Dragging a PBS to a different location/order will update the numbers and the task numbers under it. Counting from top to bot...
Kenny Louden 4 months ago in BOE Pro 0 Planned

Workflow at the Task Level.

Description: The ability to assign the workflow at the task level. The ability to assign review and approval steps for the workflow from the people assigned to the PBS when creating a task. Use Case/Example: The BOE Author will create a task for t...
Guest 3 months ago in BOE Pro 0 Planned

Include Access Tags from the user when creating from a proposal template

Description: Include Access Tags from the user when creating from a proposal template. Use Case/Example: Right now, the users Access Tags are not added to the proposal when creating from a template. Only the template access tags are added to the p...
Guest 3 months ago in BOE Pro 0 Planned

Proposal Level Permission Overrides

Proposal Level Permission Overrides like CE. Implement Proposal-Level Permission Overrides in BOE Pro similar to those in Contractor Edition (CE). This feature will allow users to set specific permissions at the proposal level, enhancing control ...
Guest 7 months ago in BOE Pro 0 Planned

Table of Contents Setting and excluding certain headings

Description: Table of Contents Setting and excluding certain headings Use Case/Example:
Kenny Louden 3 months ago in Cost Volume Pro 0 Planned