Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 396

Add "Apply to All" Material Cost

Add functionality that would allow the user to apply the same material cost to multiple occurrences of a part number in a WBS/BOM structure. For example a proposal with an IDIQ structure may have multiple occurrences of the same part number. Add f...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Time-Phased Material Ad Hoc Report

Please add the ability to run the Material Ad Hoc report by time-phase. Also, please consider the functionality to work with proposal-specific parts as we do not generally have repeatable parts and do not often utilize the common library.Thank you,
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Travel Escalation Rates for Airfare, Per Diem, Hotel, miledge, rental car, etc

Add options to apply escalation factors by year for airfare, per diem, rental car and others at one time only for all destinations; thus we don't need to manually add yearly escalation factors one by one for each trip (we have thousands of destina...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Ability to lock off shared rate tables.

| Allow rate tables to be locked/unlocked to avoid accidental change when used by multiple people. |
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Use Resource Spread Dates when using the Flex/Shift What-if feature for an Individual Resource

When Flex/Shifting an individual resource in a Task, the dates displayed in the dialog are the Start and End dates of the Task, not the dates of the spread of the specific resource. If the resource is not spread across the entire Task period of pe...
Nikolai Slepushkin about 3 years ago in ProPricer 9 0 Future consideration

Mail in the Project

Description: Need the ability to have all emails related to a project saved to the project and the ability to email from a project. Use Case/Example: Most communication about a project happens via Outlook. The problem is that the documentation exi...
Aaron Hale 7 months ago in Management Pro 0 Future consideration

Pagination for the Connect for Web

Pagination for the will return a set number of items per page when retrieving the proposal list. The purposes are to be able to retrieve large data sets faster. The primary data set is the proposal list.
Aaron Hale about 1 year ago in Connect for Web API 0 Planned

Eestimating Relationships needs to reference other BOEs.

Add summary tasks to BOE Pro and make sure they work with CERs and ERs
Aaron Hale over 1 year ago in BOE Pro 0 Planned

Append What-If Log to BOE

No description provided
Guest over 1 year ago in BOE Pro 0 Planned

/EFP endpoint numerical cost data fields precision does not align with other endpoints

Description: It was verified that the/EFP endpoint indirect cost value fields' decimal precision is controlled by the proposal properties resource decimal precision field for rounding. This is of great concern because other endpoints, such as /Cos...
Andriy Gronau 7 months ago in Connect for Web API 0 Planned