Skip to Main Content
ProPricer Ideas Portal
ADD A NEW IDEA

All ideas

Showing 367 of 367

Add Resource Code Mapping to Proposal Templates

Description Add the Resource Code Mapping Tab (and ability to Map the codes to resources) to Proposal Templates. Use Case I have the same mapping for all of my resources, and they only change once a year; I need to be able to create all my proposa...
Guest almost 2 years ago in BOE Pro 1 Planned

The ability to drag a task to another PBS

The ability to drag a task to another PBS. The task cannot be moved if it is connected to a BOE at the PBS Level.
Aaron Hale almost 2 years ago in BOE Pro 0 Planned

Adding the Match Capability to Profit/Fee in the CER Derivatives

The issue with assigning the Profit/Fee rate at the resource level is that there is no way for the CER derivatives to inherit the Profit/Fee rate assigned to the base resource that generated it.
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Refresh Labor Resources and Fields

Add the ability to refresh the resource fields based upon the current rate tables. For example, if staff switch report categories between revisions and the data is copied from a previous proposal, the report category remains as it was originally a...
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Please add the Resource Class to the Excel Export

Please add the Resource Class to the Excel Export
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Add a Default Learning Curve to Materials

Allow me to define a default Learning Curve and then I can change in the instances I need.
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Copy Material Row in Material View

Please add the ability to easily copy a row within the Material View, as the functionality exists for Resources or Travel within their respective Views. We generally use proposal-specific parts as most of our purchases aren't repeatable purchases....
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Expand the Cost Source Type selections

Why have this limited to PO, Quote and Misc? Why don't you treat the field in the Cost Source table just like a Resource. Let the Admin create their own list of Cost Sources by creating a list. This makes it very customizable for each company and ...
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Allow material quantity decimal display to be changed a single proposal

No description provided
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration

Increase UM Character Limit

Please add the ability to increase or just increase the character limit from 10 to 255 for the UM input field. We frequently get errors when importing Material Input information into ProPricer via the Exp/Imp tool in Excel.
Nikolai Slepushkin over 2 years ago in ProPricer 9 0 Future consideration